Turnkey Stadium Official Warranty

Turnkey Mini-Football Pitch and Sports Court Construction in Uzbekistan

Commercial stadiums (20×40m, 800m²) with permeable gravel drainage, 50mm FIFA monofilament turf, heavy-duty safety fencing, and 200W LED floodlights in 15–25 days.

  • FIFA Quality certified 50mm turf filled with quartz sand & SBR rubber
  • Engineered drainage preventing rainwater accumulation
  • Turnkey handover: steel frame, nylon netting, goals, and LED illumination
FREE ESTIMATE

Free measurement & estimate: football pitch construction

Leave your phone number — our engineer will call you back within 15 minutes to arrange an exact on-site estimate.

PRICING & COMPARISON

Standard Sports Pitch Specifications & Packages

ComponentCommercial Mini-Pitch (20×40m)School / Community CourtTennis & Volleyball Court
Dimensions20 × 40 m (800 m²)18 × 36 m (648 m²)18 × 36 m (648 m²)
SurfacingFIFA 50mm Monofilament turfFIFA 40–50mm turfEPDM rubber or acrylic hardcourt
Fence Height4 – 6 meters reinforced mesh4 meters safety netting3 – 4 meters chainlink + net
Lighting8–12 × 200W LED floodlights6–8 × 150W LED8 × 200W anti-glare LED
WORK PROCESS

Project execution in 4 systematic steps

PHASE 01

Excavation & Base Grading

Grading 25–35 cm depth, slope drainage channels, and geotextile membrane placement.

PHASE 02

Stone & Asphalt Drainage Layer

Dual-fraction crushed stone compaction, concrete curbing, and perimeter anchoring.

PHASE 03

Fence & LED Tower Assembly

Welding 60×60mm steel poles, protective primer coating, and commercial netting.

PHASE 04

FIFA Turf Laying & Infill

Specialist thermal seam gluing, white field marking, and quartz sand + rubber granule infill.

ONLINE CALCULATOR

Calculate your project budget in 30 seconds

Select your desired service or turf type and specify your area size.

1. Select service category
2. Plot / Ground Area (m² / sq.ft) 150 m² (1,615 sq.ft)
20 m² 800 m² (standard 20×40m field) 2,000 m²
3. Optional add-ons
PRELIMINARY ESTIMATE
16,350,000 UZS
Selected Service: Artificial grass (pile 20–50 mm)
Area Size: 150 m²
Rolls required (2×25m): 3 rolls
Estimated Duration: 2 – 4 days
Engineer Site Visit & Measurement: Free of charge
OUR PORTFOLIO

Selected completed projects

Drag the interactive Before & After slider to see our real-world transformations across Uzbekistan.

After: emerald green roll turf
Before: unprepared plot
Before After (Natural Sod)
↔
Mini-football pitch 20x40m
Stadium Construction 800 m²

Mini-Football Pitch (20×40m)

FIFA 50mm turf, gravel base & LED lighting

Playground seamless EPDM flooring
Rubber Playground 420 m²

EPDM Rubber Play Area in Residential Complex

Seamless shock-absorbing safety flooring

3D landscape and Hunter irrigation
Video Tour 1,200 m²

3D Landscape, Sod Laying & Hunter Sprinklers

Comprehensive project execution

Stabilized reindeer moss wall
Vertical Moss 45 m²

Interior Living Wall & Preserved Moss

Up to 10 years without watering

FREQUENT QUESTIONS

Frequently asked questions

What is the ROI payback timeline for a commercial mini-football field?+

A standard 20×40m field operating 8–10 hours per day in Uzbekistan typically achieves full ROI payback within 10 to 16 months.

Do you construct stadiums in all provinces of Uzbekistan?+

Yes, our mobile engineering crews bring all materials directly from our central warehouse and build fields turnkey across all 12 regions.

REGIONAL COVERAGE

Delivery and construction in Tashkent and all regions

We dispatch turf and equipment from our central warehouse to any province within 24 hours and construct turnkey sports facilities.

CONTACT US

Free consultation and our office address

Leave only your phone number — our senior specialist will contact you within 15 minutes.

FREE CONSULTATION

Leave your number — we will call you back in 15 minutes

We answer all questions, calculate itemized estimates, and send a site surveyor for free measurements.

Phone (24/7):
+998 (97) 783-82-53
Telegram Messenger:
t.me/+998977838253
Office & Showroom Address:
Tashkent city, Samarkand Darvoza street, Building 2